Aluminium Vacuum Laminate Cover
The premium product in the protective packaging range
Humidity control treated as the design problem
The panel that has to arrive dry, with its terminations clean.
By then the panel is installed, the site is live, and replacing it means opening up finished work. The cost of the failure is many times the cost of the panel.
Even light condensation on sensitive electronics, terminations and busbars causes corrosion, tracking and insulation failure.
Control panels, switchgear and distribution boards hold sensitive electronics, terminations and busbars. A sealed barrier cover with controlled humidity inside protects the panel from the factory floor right through to commissioning.
We treat humidity control inside the cover as the design problem, not just sealing. That means matching the desiccant capacity to the enclosed volume and the expected transit time, so the humidity actually stays where it should for the whole journey.
The humidity indicator option turns an invisible benefit into a visible one.
Every one of these can be changed for your application, and a sample is supplied for trial fitment before bulk production.
Commonly specified with
These are usually part of the same conversation.
From the blog
Generators, transformers and electrical panels fail differently from plain machinery: moisture reaches terminations, windings and electronics, and the damage is…
Enquiries
Send the drawing, the drum dimensions or the product data sheet. Every product is built to order, so the conversation starts with your specification, not a price list. Sample liners and trial covers are supplied for fitment before bulk production begins.