Asbestos Demolition Containment Chamber
Built to your method statement
07 / 7 · 3 products
On a licensed site, the enclosure is not a packaging decision. It is the thing that lets the work start at all.
Containment chambers made in any material for hazardous waste sites, built to the specification and requirements of each individual site. This is specialised work with a high technical and regulatory barrier to entry, and it is carried out to the site's own engineering and safety requirements.
Send us the problem
Every product we make is built to order, so the conversation starts with your specification rather than with our price list. Sample liners and trial covers are supplied for fitment before bulk production begins.