Nuclear and Hazardous Waste Site Enclosure
Built entirely to your issued engineering specification
Built to your method statement
Compliance, not price, decides this purchase. Every site is different, and the enclosure has to satisfy the method statement and the governing regulation before anyone can begin.
Built to the room, on site.
A sealed enclosure built around an asbestos removal or demolition work area to hold fibres in and stop them escaping into the surrounding environment. The chamber is made to the dimensions and layout of the specific site, in the material grade required by the contractor's method statement and by the governing regulation.
Chambers can include airlock entries, negative pressure connections, viewing panels and waste transfer arrangements, as specified.
We build to your own method statement rather than offering a fixed product. That means reading the documents, understanding the regulation being worked to, and fabricating to it. Very few packaging suppliers will engage at this level.
Every one of these can be changed for your application, and a sample is supplied for trial fitment before bulk production.
Commonly specified with
Built entirely to your issued engineering specification
Walls stand on their own, so it actually gets used
Made to your drum, not to whatever size the supplier already makes
Send us the problem
Every product we make is built to order, so the conversation starts with your specification rather than with our price list. Sample liners and trial covers are supplied for fitment before bulk production begins.