PackTech.

Industry

Demolition and Remediation

Compliance decides this purchase, not price.

Sealed polythene containment enclosure erected inside a stripped building

On a licensed site, the enclosure is not a packaging decision. It is the thing that lets the work start at all, and it has to satisfy the method statement and the governing regulation.

Specified here

Recommended products

Products built for this sector.

All products
Sealed polythene containment enclosure erected inside a stripped building

Asbestos Demolition Containment Chamber

Built to your method statement

7.1
Sealed containment unit labelled for hazardous waste on a site

Nuclear and Hazardous Waste Site Enclosure

Built entirely to your issued engineering specification

7.2
Yellow flexible bund holding drums and a generator on a hardstanding

Spill Containment Bund and Drip Tray

Walls stand on their own, so it actually gets used

7.3

From the blog

Related guides

All guides

Enquiries

Send us your requirement

Send the drawing, the drum dimensions or the product data sheet. Every product is built to order, so the conversation starts with your specification, not a price list. Sample liners and trial covers are supplied for fitment before bulk production begins.